Press "Enter" to skip to content

India tweaks 100 MW solar-plus-storage tender

A Solar Energy Corporation of India tender inviting bids to set up a 100 MWac solar project plus 50 MW/150 MWh of battery energy storage in the state of Chhattisgarh, floated in September, has had its deadline extended for a second time and the scale of the facility changed.

Based on government land in Rajnandgaon district, and originally calling for a 200 MWp DC capacity, the deadline for bidding to develop the facility had already been extended from October 27 to last Friday and has now been pushed back further, to December 15.

Popular content

To read the full story, please visit our pv magazine India site.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].

Source: pv magazine