Engineers and technicians at NASAEstablished in 1958, the National Aeronautics and Space Administration (NASA) is an independent agency of the United States Federal Government that succeeded the National Advisory Committee for Aeronautics (NACA). It is responsible for the civilian space program, as well as aeronautics and aerospace research. Its vision is "To discover and expand knowledge for the benefit of humanity." Its core values are "safety, integrity, teamwork, excellence, and inclusion."” data-gt-translate-attributes=”[{“attribute”:”data-cmtooltip”, “format”:”html”}]”>NASA’s Kennedy Space Center in Florida have completed the final testing and checkouts of the Artemis I Moon rocket ahead of rolling out to Launch Pad 39B. NASA is targeting as soon as 9 p.m. EDT (6 p.m. PDT) on Tuesday, August 16 for rollout ahead of a targeted August 29 launch.
Yesterday, the crawler-transporter rolled inside the Vehicle Assembly Building (VAB) and under the Space Launch System rocket and Orion spacecraft. Teams are currently working to prepare the integrated stack for rollout.
Over the weekend the team completed testing of the flight termination system, which marked the final major activity prior to closing out the rocket and retracting the final access platforms in the VAB.
The agency will provide a live stream of the rollout beginning at 3 p.m. EDT (12 p.m. PDT) Tuesday, August 16 on the NASA Kennedy YouTube channel.
Artemis I is the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLSNASA's Space Launch System (SLS) will be the most powerful rocket they've ever built. As part of NASA's deep space exploration plans, it will launch astronauts on missions to an asteroid and eventually to Mars. As the SLS evolves, the launch vehicle will to be upgraded with more powerful versions. Eventually, the SLS will have the lift capability of 130 metric tons, opening new possibilities for missions to places like Saturn and Jupiter.” data-gt-translate-attributes=”[{“attribute”:”data-cmtooltip”, “format”:”html”}]”>SLS) rocket, and the ground systems at Kennedy Space Center in Cape Canaveral, Florida. It is an uncrewed flight test, the first in a series of increasingly complex missions to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the Moon, paving the way for a long-term lunar presence and serving as a stepping stone to send astronauts to MarsMars is the second smallest planet in our solar system and the fourth planet from the sun. It is a dusty, cold, desert world with a very thin atmosphere. Iron oxide is prevalent in Mars' surface resulting in its reddish color and its nickname "The Red Planet." Mars' name comes from the Roman god of war.” data-gt-translate-attributes=”[{“attribute”:”data-cmtooltip”, “format”:”html”}]”>Mars.
Source: SciTechDaily